Burner Control Units
Automatic burner control units IFS 110IM, 111IM
IFS 110IM and IFS 111IM are discontinued gas-burner controllers for intermittent duty.
IFS 110IM and IFS 111IM are discontinued gas-burner controllers for intermittent duty. They support ionization or UV sensing and arrangements using one electrode or multiple flames. The mains arrangement distinguishes the two models. Honeywell identifies BCU replacements; the historical replacement-only availability ended in 2023.
Features & Benefits
- Safety Time Operation V2
- 1 seconds
- Safety Time Operation V1
- 1, 2, 3 or 5 seconds
- Start-up Safety Time
- 3, 5 or 10 seconds
- Mains Voltage
- 110/120 VAC or 220/240 VAC
- Safety time on start-up
- 3, 5 or 10 s
Applications
- Intermittent gas-burner control
Safety, Protection & Reliability
- Safety Time Operation V2
- 1 seconds
- Safety Time Operation V1
- 1, 2, 3 or 5 seconds
Control, Safety & Timing Characteristics
- Start-up Safety Time
- 3, 5 or 10 seconds
Electrical Specifications
- Mains Voltage
- 110/120 VAC or 220/240 VAC
Technical Specifications
- Safety time on start-up
- 3, 5 or 10 s
| Parameter | Published value / configuration |
|---|---|
| Safety Time Operation V2 | 1 seconds |
| Safety Time Operation V1 | 1, 2, 3 or 5 seconds |
| Start-up Safety Time | 3, 5 or 10 seconds |
| Mains Voltage | 110/120 VAC or 220/240 VAC |
| Safety time on start-up | 3, 5 or 10 s |
Values retain manufacturer model qualifications. Review Honeywell specifications ↗
Part Number
Published part numbers
2 parts
| Part Number | Description | Enquiry |
|---|---|---|
| HK84367630 | MOD,BRNR CTL ,IFS110IM WR 10/1/5T 10 SEC | Request quotation |
| KS84367630 | IFS 110IM-WR-10/1/5T | Request quotation |
Manufacturer sources
Last source check: 2026-11-02
Burner control unit · Manufacturer ownership retained; republication licence not independently confirmed
ABID Automation LTD maintains this independent product reference. Honeywell owns its product names and trademarks. Current manufacturer documentation governs specification, availability and certification.
Your next project. A clear starting point.
Tell us about your facility and what you need to achieve.
