Self-Recuperative and Radiant Tube Burners
E-Jector
E-Jector is a flange-mounted device for reducing NOx in radiant-tube systems, designed to work with Eclipse Bayonet recuperators.
E-Jector is a flange-mounted device for reducing NOx in radiant-tube systems, designed to work with Eclipse Bayonet recuperators. Each installation is custom engineered for burner and tube compatibility. The page lists 4–6-inch tubes and a maximum input, while the reported emissions reduction is specifically described as a field-trial result.
Features & Benefits
- Maximum Flue Gas Temperature
- 1400 deg F (760 deg C) at Inlet
- Vertical Exhaust Flue Spool
- Minimum 6 in (152 mm) straight spool
- Compatible Radiant Tube ID
- 4 to 6 in (102 to 152 mm)
- Emissions Sampling Tap
- 3/8 in (9.5 mm) tapped connection
- Typical NOx Reduction
- 40 to 50%
- Start-up Requirement
- Start system below 350,000 Btu/h until chamber exceeds 500 deg F (260 deg C)
- Air Inlet Connection
- 2 in NPT
- Spark Requirement
- Continuous spark required below 1400 deg F (760 deg C)
- Maximum Capacity
- 500,000 Btu/h (132 kW)
- Air Outlet Sizes
- 2 in NPSM
- Mounting Types
- Flanged to Radiant Tube Exhaust or Recuperator
- Nozzle Sizes
- 21 mm (≤ 350 kBtu/h), 24 mm (≤ 500 kBtu/h)
- The manufacturer reports reduced NOx in field trials with the engineered arrangement.
Applications
- NOx reduction in compatible radiant-tube burner systems
Overview
- Models
- FGR
Air/Exhaust/Flue Gas Temperatures
- Maximum Flue Gas Temperature
- 1400 deg F (760 deg C) at Inlet
Mechanical Design & Hardware Details
- Vertical Exhaust Flue Spool
- Minimum 6 in (152 mm) straight spool
Component/Geometry Compatibility
- Compatible Radiant Tube ID
- 4 to 6 in (102 to 152 mm)
Processing & Performance Metrics
- Emissions Sampling Tap
- 3/8 in (9.5 mm) tapped connection
- Maximum Capacity
- 500,000 Btu/h (132 kW)
Combustion Air, Blower & Emissions Specifications
- Typical NOx Reduction
- 40 to 50%
Ignition, Flame & Supervision Specifications
- Start-up Requirement
- Start system below 350,000 Btu/h until chamber exceeds 500 deg F (260 deg C)
- Spark Requirement
- Continuous spark required below 1400 deg F (760 deg C)
Connections & Interfaces
- Air Inlet Connection
- 2 in NPT
Air & Combustion Air Specifications
- Air Outlet Sizes
- 2 in NPSM
Installation & Mounting Specifications
- Mounting Types
- Flanged to Radiant Tube Exhaust or Recuperator
Dimensions & Size Specifications
- Nozzle Sizes
- 21 mm (≤ 350 kBtu/h), 24 mm (≤ 500 kBtu/h)
Applications & Compatibility
- Applications
- Flue-Gas Recirculation Device for Eclipse Tube Firing Burner
| Parameter | Published value / configuration |
|---|---|
| Models | FGR |
| Maximum Flue Gas Temperature | 1400 deg F (760 deg C) at Inlet |
| Vertical Exhaust Flue Spool | Minimum 6 in (152 mm) straight spool |
| Compatible Radiant Tube ID | 4 to 6 in (102 to 152 mm) |
| Emissions Sampling Tap | 3/8 in (9.5 mm) tapped connection |
| Maximum Capacity | 500,000 Btu/h (132 kW) |
| Typical NOx Reduction | 40 to 50% |
| Start-up Requirement | Start system below 350,000 Btu/h until chamber exceeds 500 deg F (260 deg C) |
| Spark Requirement | Continuous spark required below 1400 deg F (760 deg C) |
| Air Inlet Connection | 2 in NPT |
| Air Outlet Sizes | 2 in NPSM |
| Mounting Types | Flanged to Radiant Tube Exhaust or Recuperator |
| Nozzle Sizes | 21 mm (≤ 350 kBtu/h), 24 mm (≤ 500 kBtu/h) |
| Applications | Flue-Gas Recirculation Device for Eclipse Tube Firing Burner |
Values retain manufacturer model qualifications. Review Honeywell specifications ↗
Part Number
Published part numbers
3 parts
| Part Number | Description | Enquiry |
|---|---|---|
| 10006510 | EDCTR,FGR,ASY,24 MM NZL | Request quotation |
| 10027321 | NZL,EDCTR,FGR,ASY,21 MM BORE | Request quotation |
| 10027324 | EDCTR,FGR,ASY,21 MM NZL | Request quotation |
Manufacturer sources
Last source check: 2026-11-02
E-Jector Product Image · Manufacturer ownership retained; republication licence not independently confirmed
ABID Automation LTD maintains this independent product reference. Honeywell owns its product names and trademarks. Current manufacturer documentation governs specification, availability and certification.
Your next project. A clear starting point.
Tell us about your facility and what you need to achieve.
