Manual Valves & Filters
Manual valves with thermal equipment trip AKT..TAS
AKT..TAS combines manual gas isolation with automatic heat-triggered closure.
AKT..TAS combines manual gas isolation with automatic heat-triggered closure. The high-temperature-resistant arrangement has a published trip point of 95°C ±5 K. The source calls for WL-HT seals at the inlet and identifies the applicable German installation rules, with threaded/flanged sizes and pressure versions selected for the installation.
Features & Benefits
- Ambient Temperature Range
- -20 to +60 deg C
- Thermal Trip Temperature
- Trip activation at 95 deg C ± 5 deg C, 95 deg C ± 5 deg C
- Installation Orientation
- Any; minimum 20 mm wall clearance
- Maintenance Interval
- Replace valve after thermal trip
- Inlet Pressure Range
- Up to 5 bar (GT5), or 16 bar with HT screws and flange seals
- Media Compatibility
- Natural Gas, Town Gas, LPG (gaseous)
- Thermal Resistance
- 650 deg C for at least 60 minutes
- Product Variants
- AKT..F..TAS - Flanged manual valve with integrated thermal equipment trip|AKT..R..TAS - Threaded manual valve with integrated thermal equipment trip
- Connection Type
- Inlet - Rp internal thread (ISO 7‑1) or PN16 flange (ISO 7005), Outlet - Rp internal thread/R male thread, PN16 flange (ISO 7005)
- Leakage Rating
- ≤ 30 l/h at 4 bar test pressure
- Seal Material
- PTFE (Teflon) ball seals; Viton spindle seal
- Nominal Sizes
- DN 15 to 150 (variant dependent)
- Closing Time
- 60 seconds
- Valve Type
- Manually operated ball valve with automatic thermal shut‑off
- Functions
- Manual main shut‑off valve for gas; automatically isolates gas pipelines in the event of a fire
- Approvals
- Compliant with TRGI (DVGW G 600) and German Firing System Directive, Gas Appliances Directive; DIN EN 331; DIN 3586, DVGW test marks for specific AKT..TAS variants
- Material
- Brass (threaded versions), Ductile iron/steel (flanged versions), TAS housing steel, galvanized
- DN
- 10-150
- pu
- max. 4 or 5 bar
- Thermal closure provides automatic gas isolation on overheating.
Applications
- Manual gas isolation with thermal shutdown
Environmental Conditions
- Ambient Temperature Range
- -20 to +60 deg C
Maximum/Minimum Temperature Limits
- Thermal Trip Temperature
- Trip activation at 95 deg C ± 5 deg C, 95 deg C ± 5 deg C
Installation & Mounting Specifications
- Installation Orientation
- Any; minimum 20 mm wall clearance
Electrical Specifications
- Maintenance Interval
- Replace valve after thermal trip
Pressure Specifications
- Inlet Pressure Range
- Up to 5 bar (GT5), or 16 bar with HT screws and flange seals
Applications & Compatibility
- Media Compatibility
- Natural Gas, Town Gas, LPG (gaseous)
Temperature & Thermal Specifications
- Thermal Resistance
- 650 deg C for at least 60 minutes
Product Overview & Classification
- Product Variants
- AKT..F..TAS - Flanged manual valve with integrated thermal equipment trip; AKT..R..TAS - Threaded manual valve with integrated thermal equipment trip
Connections & Interfaces
- Connection Type
- Inlet - Rp internal thread (ISO 7‑1) or PN16 flange (ISO 7005), Outlet - Rp internal thread/R male thread, PN16 flange (ISO 7005)
Safety, Protection & Reliability
- Leakage Rating
- ≤ 30 l/h at 4 bar test pressure
Material Specifications
- Seal Material
- PTFE (Teflon) ball seals; Viton spindle seal
- Material
- Brass (threaded versions), Ductile iron/steel (flanged versions), TAS housing steel, galvanized
Dimensions & Size Specifications
- Nominal Sizes
- DN 15 to 150 (variant dependent)
Actuation, Valve & Motion Control Specifications
- Closing Time
- 60 seconds
- Valve Type
- Manually operated ball valve with automatic thermal shut‑off
Control, Logic & Functional Behavior
- Functions
- Manual main shut‑off valve for gas; automatically isolates gas pipelines in the event of a fire
Standards & Certifications
- Approvals
- Compliant with TRGI (DVGW G 600) and German Firing System Directive, Gas Appliances Directive; DIN EN 331; DIN 3586, DVGW test marks for specific AKT..TAS variants
Technical Specifications
- DN
- 10-150
- pu
- max. 4 or 5 bar
| Parameter | Published value / configuration |
|---|---|
| Ambient Temperature Range | -20 to +60 deg C |
| Thermal Trip Temperature | Trip activation at 95 deg C ± 5 deg C, 95 deg C ± 5 deg C |
| Installation Orientation | Any; minimum 20 mm wall clearance |
| Maintenance Interval | Replace valve after thermal trip |
| Inlet Pressure Range | Up to 5 bar (GT5), or 16 bar with HT screws and flange seals |
| Media Compatibility | Natural Gas, Town Gas, LPG (gaseous) |
| Thermal Resistance | 650 deg C for at least 60 minutes |
| Product Variants | AKT..F..TAS - Flanged manual valve with integrated thermal equipment trip; AKT..R..TAS - Threaded manual valve with integrated thermal equipment trip |
| Connection Type | Inlet - Rp internal thread (ISO 7‑1) or PN16 flange (ISO 7005), Outlet - Rp internal thread/R male thread, PN16 flange (ISO 7005) |
| Leakage Rating | ≤ 30 l/h at 4 bar test pressure |
| Seal Material | PTFE (Teflon) ball seals; Viton spindle seal |
| Material | Brass (threaded versions), Ductile iron/steel (flanged versions), TAS housing steel, galvanized |
| Nominal Sizes | DN 15 to 150 (variant dependent) |
| Closing Time | 60 seconds |
| Valve Type | Manually operated ball valve with automatic thermal shut‑off |
| Functions | Manual main shut‑off valve for gas; automatically isolates gas pipelines in the event of a fire |
| Approvals | Compliant with TRGI (DVGW G 600) and German Firing System Directive, Gas Appliances Directive; DIN EN 331; DIN 3586, DVGW test marks for specific AKT..TAS variants |
| DN | 10-150 |
| pu | max. 4 or 5 bar |
Values retain manufacturer model qualifications. Review Honeywell specifications ↗
Manufacturer sources
Last source check: 2026-11-02
Manual valves with thermal equipment trip · Manufacturer ownership retained; republication licence not independently confirmed
ABID Automation LTD maintains this independent product reference. Honeywell owns its product names and trademarks. Current manufacturer documentation governs specification, availability and certification.
Your next project. A clear starting point.
Tell us about your facility and what you need to achieve.
