Odorizers
GOE-SO1/GOE-SO1P
GOE-SO1 and GOE-SO1P use injection to dose odorant into gas.
GOE-SO1 and GOE-SO1P use injection to dose odorant into gas. Odorant moves from the storage tank with gravity assistance and the diaphragm pump follows gas flow. Concentration can be adjusted continuously, and the tank can be refilled while the plant operates. Additional pumps extend the operating area.
Models: GOE-SO1/GOE-SO1P
Features & Benefits
- Maximum back pressure
- 80 bar
- Storage capacity
- 200–1,200 l
- Maximum gas throughput
- 250,000 Nm³/h with a pump, dependent on odorant concentration
- Refilling does not require stopping operation
- Low maintenance requirement
Applications
- Gas odorization with standard odorants including THT and mercaptans
Technical Specifications
- Maximum back pressure
- 80 bar
- Maximum gas throughput with pump
- 250,000 Nm³/h, dependent on odorant concentration
- Odorant container
- 200–1,200 l
| Parameter | Published value / configuration |
|---|---|
| Maximum back pressure | 80 bar |
| Maximum gas throughput with pump | 250,000 Nm³/h, dependent on odorant concentration |
| Odorant container | 200–1,200 l |
Values retain manufacturer model qualifications. Review Honeywell specifications ↗
Part Number
Published model / variant identifiers. A full ordering code requires the manufacturer configuration.
Published part numbers
3 parts
| Part Number | Description | Enquiry |
|---|---|---|
| HON-GOE-V4-100 | ODORIZING SYSTEM V4 100L VESSEL | Request quotation |
| HON-GOE-V4-70 | ODORIZING SYSTEM V4 70L VESSEL | Request quotation |
| HON_IN | Injection Nozzle | Request quotation |
Manufacturer sources
https://process.honeywell.com/us/en/products/gas/automation/odorizers/goe-so1-goe-so1p
Last source check: 2026-11-02
GOE-SO1/ GOE-SO1P Image · Manufacturer ownership retained; republication licence not independently confirmed
ABID Automation LTD maintains this independent product reference. Honeywell owns its product names and trademarks. Current manufacturer documentation governs specification, availability and certification.
Your next project. A clear starting point.
Tell us about your facility and what you need to achieve.
